Understand the work behind your extension budget before comparing builders’ quotations. Price My Works reviews your drawings and specification, then agrees the scope of a tailored estimate with you.
From £118.80 including VAT (£99 + VAT at 20%). Introductory estimating bands cover works up to £500,000; larger or unusually complex projects are quoted separately. Drawings, scope and exact fee agreed before paid work. See pricing · Subject to terms and agreed scope.
AI-created illustration · not a completed customer project or supplier stock photograph
↗Plan your building budget
What affects the cost of a house extension?
Floor area is only the starting point. Ground conditions, access for excavation, drainage alterations, structural openings, roof design, glazing, services and finishes can all change the scope. A shell-only quotation is different from a finished room with a kitchen, heating and decoration.
What should I send?
Send the latest floor plans, elevations and sections, the project postcode and a short description of what you want included. Add structural drawings or calculations if available, your specification, site photographs and any existing builders’ quotes. A dimensioned PDF is useful: we check its scale against a known measurement rather than relying on the printed scale label alone.
What can the estimate cover?
The agreed scope may include excavation and disposal, foundations, drainage, walls, structural work, roofing, windows and doors, services and internal finishes. Tell us whether you need a shell, a watertight structure or a fuller building package. We identify information that is missing and distinguish assumptions and provisional allowances from specified work.
What else belongs in the budget?
Ask which items sit outside the building package: professional fees, applications and approvals, surveys, specialist investigations, utility changes, kitchens, landscaping and VAT. Ground conditions or hidden defects may need investigation. An estimate cannot establish their condition from drawings alone.
How does this help when comparing builders?
Use the same drawing revisions and specification for each quotation. Compare inclusions, quantities, allowances, waste removal, temporary works and making good before comparing totals. If you already have quotations, ask about a separately scoped quotation review to identify gaps and questions for the builders.
Send what you have and explain your stage. We will confirm what level of cost advice the information supports. Missing measurements or specifications may need clarification before an estimate can be prepared.
Is the estimate a fixed builder’s quotation?
No. It is cost guidance for the agreed scope and pricing date. The contractor carrying out the work must confirm its own price and terms. The estimate does not provide structural design, a condition survey or statutory approval.