PROJECT ENQUIRIES OPEN · Scope and fee agreed before paid work
Price My Works

Price My Works · detailed estimating

Know what you’re paying for.
Before you pay your builder.

A small estimating fee can help you avoid much larger, unnecessary costs. Get a detailed breakdown to understand the quantities, spot possible extras and find opportunities to save before you agree the work.

From £118.80 including VAT (£99 + VAT). Scope and total fee agreed before payment. A complete take-off is priced for the work involved.

Make the quantities useful

Know what each line means.

A total is easier to discuss when you can see how the work has been described, measured and priced.

DescriptionQuantityUnitRateTotalWhat is included

Send the latest drawing revisions, written dimensions and specification. Any separately agreed scaled take-off needs a known measurement for calibration. The report identifies the information used, what is assumed and what still needs clarification.

We agree which work sections and cost detail you need before starting. A missing quantity, specification or rate stays visible as an unresolved item; it is not treated as free work. Final quantities need checking before ordering or construction.

Take your materials list straight to local merchants.

Use the material quantities from your detailed estimate to ask several merchants for their best price for the whole order delivered to your site.

Send the merchant sheet. Each merchant prices the same specification and quantities, with room for pack sizes, delivery, lead times and a whole-order discount.

Keep the comparison for yourself. Compare up to three returns against your PMW materials allowance, see the total including VAT and record any improvement on the first offer.

An explained range

Low. Central. High.
The same work, understood.

Where your information and suitable pricing evidence support it, ask for a tailored estimate that explains three cost scenarios and the reasons behind the range.

Low estimate

A competitive scenario

The lower assessed cost for the agreed work, with the pricing assumptions made clear.

Central estimate

A planning figure

PMW’s assessed central cost for the stated scope, specification and project conditions.

High estimate

The upper scenario

A higher assessed cost, explaining which rates or uncertainties could move the figure up.

Keep the scope consistent. The same quantities and specification underpin the scenarios. Different finishes or construction options are identified as separate alternatives.

Know the basis. The report states its pricing date, location, rate sources or pricing basis, assumptions and treatment of VAT. The range is an assessment for that scope, not a guaranteed contractor price.

Separate quotes from estimates. The lowest and highest quotes you upload show what those builders have offered. They do not, on their own, establish an independent market benchmark.

The level of pricing analysis is confirmed in your proposal. The free comparison and £19.99 automated review organise and compare supplied quotes; they do not include this drawing-based price assessment.

Larger or more complex contracts

Go deeper into
the cost build-up.

Ask for a separately scoped commercial comparison that looks beyond the headline tender totals.

Measured works

The defined construction work, with quantities and rates. Labour, materials, plant and subcontract allowances are broken down to the level agreed in your scope.

Site preliminaries

The costs of setting up, managing and running this particular site, considered alongside access and the programme.

Overheads and profit

The stated or assessed allowance for the contractor’s business costs and profit. We identify whether it is already included in the rates before adding anything separately.

Provisional sums and risks

Work that is not fully defined and project uncertainties are identified with their assumptions. These allowances stay visible in the breakdown.

We can agree a closer comparison of tender inclusions, programme allowances, exclusions and unresolved items. The extra fee reflects the drawings, trades, quotations and analysis involved. You see the scope and total before deciding.

Overheads and profit are not added twice. A contractor’s undisclosed profit remains unknown; an estimating allowance is not a statement of what that builder earns. A larger contract does not automatically mean a higher overheads-and-profit percentage.

A clear next step

Put the detail in your hands.
Before you agree the price.

Start with a free enquiry. Tell us about the project, the drawings you have and whether you need quantities, a priced breakdown or a fuller commercial comparison.

We confirm the deliverables, fee including VAT and turnaround. You can then add your documents privately and decide whether to proceed.

The aim is to help you avoid overlooked costs and negotiate with clearer information; savings are not guaranteed. PMW provides cost guidance for the agreed scope. Your chosen contractor confirms its quotation and terms for carrying out the work. Read the service information.

PMW · AUTOMATED WEBSITE HELP

How can we help?

Automated website help with prepared PMW answers. For a reply from the team, send an enquiry.

PMW help

From comparing builders’ quotes to getting started with an estimate, let’s find the right next step.

Opening the help topics…

Leave out personal and payment details.0/600